Exterior remodeling across El Dorado County, from El Dorado Hills to Placerville.

El Dorado Hills and Cameron Park generally use El Dorado County building review, while Placerville has its own city authority. Foothill access, property-specific fire requirements and any historic or association review can affect the exterior scope.

Communities we serve in El Dorado County

Reviewed . Every community links to its own page and to a page for each exterior trade. All four counties.

Permits and jurisdiction in El Dorado County

Who issues permits in El Dorado County?

El Dorado County has only two incorporated cities, Placerville and South Lake Tahoe, and everything else in the county is unincorporated. That makes the jurisdiction map simpler than Sacramento or Placer and more consequential. El Dorado Hills and Cameron Park, for all their size, have no city hall; a reroof, a window replacement, or a structural dry rot repair in Serrano, Blackstone, Promontory, Bass Lake Hills, Cameron Airpark Estates, or along Green Valley Road is permitted by El Dorado County Building Services. Placerville, the county seat, is the one community on this page with its own authority, the City of Placerville Building Division, and only inside the city limits. Apple Hill, Diamond Springs, and the hillside parcels along Placerville Drive outside the line are county.

Which El Dorado County addresses use the county permit office?

El Dorado Hills and Cameron Park have Community Services Districts, but the county remains the building-permit authority for their unincorporated parcels. Some properties have CSD-administered covenants, an association or another design-review arrangement. Establish which documents and reviewer apply to the actual address instead of assuming every village follows the same process. Placerville has its own local historic-review requirements for designated properties and districts. Approval of appearance does not decide whether a retained window frame is sound or whether a particular siding assembly is suitable; those need their own assessment.

Do wildfire construction rules apply in El Dorado County?

Ask El Dorado County Building Services, or the City of Placerville for a property inside its limits, to identify the approvals for the complete proposed exterior scope. Include roof, window, siding and structural work as well as related finish repairs in that inquiry. Use the current parcel map and the local building authority’s scope review together. The 2025 California Wildland-Urban-Interface Code, Title 24 Part 7, Chapter 5, contains the current wildfire construction provisions. A city or county name, nearby vegetation or a mapped zone alone does not establish every required alteration to an existing home. Ask the reviewer to identify the applicable assembly and related details, and separate required work from optional home-hardening choices in the estimate. Record the required roof, wall, glazing or vent provisions that attach to the particular project so they can be priced and documented accurately.

Does floodplain review apply in El Dorado County?

Fire-service boundaries and building-permit boundaries are separate matters. Confirm the appropriate department or district when a proposed scope raises a fire-review question. The El Dorado Fire Safe Council provides local home-hardening resources, while permit requirements should be resolved with the responsible authority. Slope does not eliminate flood or drainage questions: creek corridors and individual lots need their own map and site checks. If floodplain review may apply, identify the parcel’s current mapped status and discuss the complete proposed project with the local floodplain administrator. Do not assume that a roof-only scope is exempt, or that combining several trades automatically triggers a particular requirement. Valuation methods, project history and local rules can matter. Keep the written determination with the building-permit documents so later scope changes can be checked against it.

Climate and building conditions

Which energy-code climate zone covers El Dorado County?

The listed ZIP codes for El Dorado Hills, Cameron Park and Placerville are listed in California Energy Commission climate zone 12. Check the actual address and the proposed alteration against the applicable energy-code requirements. The 2025 Energy Code applies to permit applications from January 1, 2026. For windows, identify the product ratings, opening dimensions and installation method; for roofing, establish which reflectance or other provisions apply to the assembly and scope. A climate-zone label is a starting point for compliance, not approval of a particular product or installation. Have the estimate identify the documentation and any compliance work included in the price.

How do heat, rain and exposure affect exterior work in El Dorado County?

The service area spans foothill locations with different elevations, exposures and lot access. Measure roof geometry and identify valleys, chimneys, wall intersections and any solar equipment before comparing roofing proposals. For gutters, use the contributing roof area, local design rainfall, outlet arrangement and discharge route; an annual rainfall total cannot substitute for that sizing work. A regional weather description also cannot diagnose a leak. Document where water appears, what investigation is proposed and how adjacent finishes will be restored after repair.

How do trees and shade affect exterior work in El Dorado County?

A sloping El Dorado Hills, Cameron Park or Placerville lot may change scaffold access, material handling and the route for roof runoff. Identify those conditions at the site rather than assume every foothill property has them. Where trees are near a roof, discuss debris access, cleaning and any constraints on work around protected vegetation. Check visible staining or deteriorated wood to establish the source and extent of moisture. Neither shade nor a hillside address alone proves decay or establishes which building component has failed.

Housing stock and market

How old are El Dorado County homes?

El Dorado County has 94,653 housing units, a median year built of 1983, a median owner-occupied value of $679,900, and 77 percent owner occupancy, the highest of the four counties we serve (U.S. Census Bureau, ACS 2020–2024 5-year). The largest single decade is the 1970s at 22 percent, followed by the 1980s at 18 percent; together that is four in ten county homes. The 2000s add 16 percent, the 1990s 14 percent, the 1960s 11 percent, and 2010 or later 7 percent, with 12 percent built before 1960. The county-wide figures include South Lake Tahoe and the Highway 50 mountain communities, so their median construction year differs from El Dorado Hills on its own, where the median build year is 2002.

Which El Dorado County neighborhoods do these figures describe?

Cameron Park, older El Dorado Hills neighborhoods and Placerville include established housing, while later development in areas such as Serrano, Promontory, Blackstone and Bass Lake Hills adds other construction periods. Census age data do not identify cladding, roofing, window materials or previous replacements in those neighborhoods. Inventory the actual exterior and ask for records of additions, reroofs and window work. Where old and new assemblies meet, show the transition in the scope so a material choice does not leave the drainage detail unresolved.

What do the figures mean for an exterior project in El Dorado County?

Use the property assessment to compare repair and replacement options, then add the approvals that apply to that address. For covered renovation on a pre-1978 house, assess lead-safe requirements using the actual construction date and painted-surface disturbance. County decade totals cannot establish which homes qualify. The county median owner-occupied value of $679,900 provides market context; it does not prove that an upgrade is worthwhile for a particular owner. Price required repairs and documented compliance work separately from optional finish changes or additional home hardening.

Share of El Dorado County housing units by decade built
BuiltShare of homes
Before 19403%
1940–19493%
1950–19596%
1960–196911%
1970–197922%
1980–198918%
1990–199914%
2000–200916%
2010 and later7%

El Dorado County: 94,653 housing units, median year built 1983, median owner-occupied value $679,900, 77% owner-occupied. Source: U.S. Census Bureau, American Community Survey 2020–2024 5-Year Estimates, tables B25034 (year structure built), B25035 (median year built), B25077 (median value, owner-occupied), B01003, B25003 (ACS 2024 5-year).

Planning exterior work in El Dorado County

Six trades, one written-scope standard. Request an estimate for a home in El Dorado County.

Check the proposed wall assembly
For siding work in Cameron Park, El Dorado Hills or Placerville, identify the affected material and elevations, then verify any required assembly for the property and permit scope. See siding.
Compare roof covering and repair options
Inspect the covering, underlayment, decking and flashing before selecting tile reuse or another replacement approach. Include access and any solar work explicitly rather than assume a standard foothill package. See roofing.
Size roof drainage for the site
Measure the roof catchments and outlets, use applicable design rainfall, and trace the discharge route. Consider access and debris maintenance before choosing a gutter guard. See gutters & gutter guards.
Assess damaged trim and framing
For visible deterioration on a shaded wall or tall rear elevation, investigate moisture and establish the affected components. Price safe access, opening-up and finish restoration in the repair scope. See dry rot & trim repair.
Choose a method for each opening
Compare repair, retained-frame and full-frame work against the actual assembly, required product ratings and any design review. A Placerville or El Dorado Hills address does not determine the installation method. See windows & doors.
Coordinate preparation and appearance review
Identify repairs and coatings for each substrate, and confirm any applicable HOA, CSD or historic approval for the proposed finish. The approved color does not replace an assessment of the surface. See exterior painting.

Questions from El Dorado County homeowners

Do wildfire construction rules apply to my El Dorado Hills reroof?

Use the current parcel map and the local building authority’s scope review together. The 2025 California Wildland-Urban-Interface Code, Title 24 Part 7, Chapter 5, contains the current wildfire construction provisions. A city or county name, nearby vegetation or a mapped zone alone does not establish every required alteration to an existing home. Ask the reviewer to identify the applicable assembly and related details, and separate required work from optional home-hardening choices in the estimate.

Who issues permits in El Dorado Hills and Cameron Park, the CSD or the county?

El Dorado County is the building-permit authority for these unincorporated communities. A CSD, association or other reviewer may administer recorded design requirements for a particular property, but that approval is separate from the building permit. Check the address and current documents rather than assume every village has both reviews. The estimate should name each applicable submission, who handles it and which selections must be settled before ordering.

Is my Placerville house permitted by the city or the county?

Inside the city limits, the City of Placerville Building Division. Outside them, even with a Placerville address, El Dorado County Building Services. Apple Hill, Diamond Springs, and much of the housing along Placerville Drive and the Highway 50 corridor is county. Main Street historic district properties inside the city also carry design review for visible exterior changes. We confirm the parcel before the estimate is finalized.

My HOA approved the new roof color. Does that replace the county permit?

No. Appearance approval and building-code review serve different purposes. Confirm whether the actual reroof needs county or city approval, association or CSD review, or both. A same-color description does not by itself establish an exemption from either process. Have the proposal identify the required product documentation and the sequence of approvals before materials are ordered, including any change requested after the original selection.

How should a foothill property’s weather and slope affect the estimate?

Use the actual site conditions. For roof drainage, establish local design rainfall, contributing roof area, outlets and discharge; annual rainfall alone is not a sizing method. For walls and trim, record exposure, access and observed damage without assuming that shade proves decay. A sloping lot may add scaffold or material-handling work, which should be stated separately so competing proposals cover the same access and restoration responsibilities.

Is El Dorado County in the same Title 24 climate zone as Sacramento?

The listed El Dorado Hills, Cameron Park and Placerville ZIP codes are in CEC climate zone 12. That does not describe every location in the county or approve a particular window or roof assembly. Check the actual address, proposed alteration and compliance method. The 2025 Energy Code applies to permit applications from January 1, 2026; the estimate should identify the product ratings and any related work required for that scope.

Do I have to change my vents and gutters when I replace siding in Cameron Park?

Ask El Dorado County Building Services which provisions apply to the actual siding project and any vents or gutters it affects. Record required alterations separately from optional hardening measures and identify the proposed products and assemblies. A mapped hazard category alone is not a list of mandatory replacements, and an unmapped description is not a blanket exemption. Resolve those details before comparing estimates or ordering materials.

Tell us about your El Dorado County project.

Share the city, the house, and what you have noticed. We'll review the details and contact you about the next step.

Request an Estimate

No budget, address, or photos needed to inquire.